    Our Kitchen Design-Build Process

    One team. One contract. Five clear steps from your first conversation to your finished kitchen.

    Design, permits, and construction — all managed in-house by a licensed LA contractor.

    Licensed & Insured
    15+ Years Experience
    100+ Remodels Completed
    4.9★ Rating

    No pressure. No obligation. Speak directly with a licensed contractor.

    Why Design-Build?

    One Team From Start to Finish

    The design-build model eliminates the friction of coordinating between separate designers, architects, and contractors.

    Single Point of Contact

    One project manager coordinates design, permits, and construction. No miscommunication between separate firms.

    Faster Project Delivery

    Design and pre-construction overlap reduces total project time by 20–30% compared to the traditional bid process.

    Budget Accuracy

    The same team that designs also builds — so cost estimates are grounded in real construction experience, not theoretical numbers.

    Step by Step

    5 Steps to Your Dream Kitchen

    Here's exactly what happens when you choose New Dawn for your kitchen remodel.

    Step 01Free • In-Home • No Obligation

    Initial Consultation

    We visit your home to understand your vision, assess the existing space, discuss your lifestyle needs, and establish a preliminary budget range. This is a no-pressure conversation — not a sales pitch.

    What you get:

    • Space assessment and feasibility review
    • Discussion of layout options and possibilities
    • Preliminary budget range based on your goals
    • Clear next steps if you decide to move forward
    Step 022–3 Weeks

    Design & 3D Renderings

    Our design team creates detailed floor plans and photorealistic 3D renderings so you can see your new kitchen before a single wall is touched. We refine until you're thrilled with every detail.

    What you get:

    • Detailed floor plan with measurements
    • Photorealistic 3D renderings from multiple angles
    • Material and finish selections with samples
    • Itemized scope of work and final budget
    Step 032–4 Weeks

    Permits & Approvals

    We prepare all permit documents, submit to the City of LA (or your local jurisdiction), and manage the plan check process. You never need to visit a city office or chase down inspectors.

    What you get:

    • Complete permit application preparation
    • Structural engineering drawings (if needed)
    • Plan check management and corrections
    • Permit issuance coordination
    Step 046–10 Weeks

    Construction & Build

    Our in-house crew handles demolition, rough-in, inspections, and finish work. You'll receive weekly progress updates and have a dedicated project manager throughout.

    What you get:

    • Dedicated project manager and daily oversight
    • Weekly progress updates with photos
    • All inspections coordinated and passed
    • Clean, safe work site maintained daily
    Step 052–3 Days

    Final Walkthrough & Handover

    We walk through your completed kitchen together, reviewing every detail against the approved plans. Any punch list items are resolved before handover. Your kitchen is ready to enjoy.

    What you get:

    • Detailed punch list review and completion
    • Final city inspection and sign-off
    • Appliance orientation and testing
    • Warranty documentation package
    FAQ

    Design-Build Process Questions

    Ready to Start Your Kitchen Remodel?

    Book a free in-home consultation. We'll assess your space, discuss your vision, and provide a clear plan with no obligation.